European Union (Withdrawal) Act 2018 Work packages before Parliament
2018 c. 16. An Act of Parliament gaining Royal Assent on 26 June 2018.
Read the enabling legislation at legislation.gov.uk.
There are 7 work packages.
Work package things per page: 20 50 100
-
Ecodesign for Energy-Related Products and Energy Information (Amendment) Regulations 2026
A work package, made available on 6 July 2026, subject to the Made negative procedure. Scrutiny period described by Bicameral instruments (clock stops if both Houses rise).
-
Withdrawal Agreement (Windsor Framework and Governance) (Amendment) Regulations 2026
A work package, made available on 6 July 2026, subject to the Draft affirmative procedure.
-
Railways (Interoperability in Northern Ireland) (Convention on International Carriage by Rail) (Amendment) Regulations 2026
A work package, made available on 29 June 2026, subject to the Draft affirmative procedure. Scrutiny period described by Bicameral instruments (clock stops if both Houses rise).
-
Plant Health, Seeds, Seed Potatoes and Plant Propagating Material (Amendment) (Northern Ireland) Regulations 2026
A work package, made available on 22 June 2026, subject to the Draft affirmative procedure.
Committee concerns raised.
Member intervention motion tabled.
-
Batteries (Placing on the Market) (Northern Ireland) Regulations 2026
A work package, made available on 4 June 2026, subject to the Draft affirmative procedure.
Committee concerns raised.
-
Supply of Machinery (Safety) (Amendment etc.) and the EU Machinery Regulation (Enforcement etc. in Northern Ireland) Regulations 2026
A work package, made available on 1 June 2026, subject to the Draft affirmative procedure.
Committee concerns raised.
-
Pollution Prevention and Control (Fees) (Miscellaneous Amendments) Regulations 2026
A work package, made available on 14 May 2026, subject to the Draft affirmative procedure.
Showing 1 - 7 of 7.
Previous Next